Case 3
Case 3
Detailed

    Professional manufacture + rigorous design + precise construction = winner


A company's aeration transformation case of the sewage plant in Shandong  


1.png


2.png


Before the transformation

Aeration is obviously inhomogeneous , and the original system is suspected to be damaged and have air leakage. 



3.png



4.png


Famous brand pipes 



5.png



6.png



Skilled welding technique




7.png



8.png



9.png



10.png


Rigorous pipeline gas-tight test 

——Ensure one pass of the on-site aeration debugging



11.png


12.png


Aeration debugging under different water depths



13.png


After the transformation

Perfect microporous aeration effect



Prev:GSD in Taiwan
Next:Case 2

Share