A company's aeration transformation plan of the sewage plant in Chengdu 


Product performance + quick construction = winner


1507970785103717.png


1507971482465907.jpg

Overview of the sewage plant


The plant is the industrial sewage treatment plant, with a daily sewage treatment capacity of 150,000t.


GSD undertakes transformation of aeration basins.



1507971330986465.jpg

Fan power required by every two groups of aeration basins before the replacement is 183.3KW.



1507971169402065.png

Fan power required by every two groups of aeration basins after the replacement is 165.8KW.




Energy conservation comparison calculation:

Every two groups before the replacement:

      Monthly electric charge: 183.3kw.h×24h×30 days× RMB 0.8= RMB 105,580 

      Annual electric charge: RMB 105,580 ×12= RMB 1,266,960 

Every two groups after the replacement:

      Monthly electric charge: 165.8kw.h×24h×30 days× RMB 0.8= RMB 95,501 

      Annual electric charge: RMB 95,501 ×12= RMB 1,146,012

Annual cost savings for every two groups: RMB 1,266,960-RMB 1,146,012 =RMB 120,948 


Annual electric charge savings of the plant:  RMB 120,948  × 7 / 2 = RMB 423,318 