GSD in overseas market
Kungur, located in Privolzhski district of Russian Federation, is a modern reconstruction sewage treatment station. Kungur was built in the end of 2005 and completed in September 2009 with designed daily processing capacity of 15,000 cubic meters andusing A2O+ oxidation ditch process.
In this project, GSD submersible mixer MA was applied in anaerobic tank, low’-speed flow propeller LFP was applied for the oxidation ditch, and submersible solid handling pump CP was applied to deliver the activated sludge.
This equipment was well-installed in September 2009, and our customers are satisfied with the stable performance and wastewater treatment results to their expected requirements.
GSD’S LFP is applied for mixing in oxidation ditch
GSD’S MA is applied for mixing in anaerobic pond
Project name:Poultry farms in Naberezhnye Chelny city Republic of Tatarstan of Russia
Product name: DAF-10,DAF-12,SMV,CP,PL
Product model: DAF 1set for each, 3 units of SMV, 4 units of CP, 2units of PL.
Installation time: March, 2012
Operation condition: Well-operated.
Customers’ feedback: Excellent.
Project name:Water distribution project in Chonburi, Thailand
Product name: single-stage single-suction horizontal centrifugal pump ISB300/250-1000-65, with motor 280kW/4P.
Quantity: 5 sets
Installation time: Installing on the end of 2005, and starting to operate on 2006.
Operation condition: Well-operated.
Customers’ feedback: Excellent.
Project name: water distribution project in Chonburi, Thailand
Product Name: single-stage double-suction horizontal centrifugal pump.
Product model: DH(V)400-1688-139 for 2 units, with motor 3300V/ 50Hz.
Installation time: Installing on the end of 2008, and starting to operate in 2009.
Operation condition: Well-operated during one year operation.
Customers’ feedback: Excellent.
Project name:Wastewater treatment project in Hungary
Product name: MA2.2/8-320-740, MA10/12-620-480 and disc diffuser RSD330.
Product model: 4sets for MA2.2/7, 2 sets for MA10/12, 170 pieces for RSD330
Installation time: End of 2011.
Operation condition: Well-operated.
Customers’ feedback: Excellent.